Phase 2 scope: Trunks and vaults only — lit, assembled, and activated. No home drops. Distribution ports are prepared and certified for future drop connections. Slider saves automatically.
0%
Phase 2 Details
Trunk & vault build extending from Phase 1 junction. Prepared for future drops — no home connections in this phase.
Route Length~3,800 ft
Vaults5 (V6–V10)
Future Homes12 (drops later)
Fiber Type144-ct trunk
ConduitNot started
Trunk StatusNot lit
Active Vaults0 / 5
Drop ReadyNo
Vault Readiness
Each vault activates as the trunk is lit and tested through its position.
Note: Home drops (TH-301 through TH-412) are shown as gray placeholders only. These homes will receive drop connections in a future phase after Phase 2 trunk/vault build is complete.