Phase 2 — Interactive Map

Trunk & vault build-out only — lit, assembled, activated, prepared for future drops

Phase 2 scope: Trunks and vaults only — lit, assembled, and activated. No home drops. Distribution ports are prepared and certified for future drop connections. Slider saves automatically.
0%
PHASE 2 — TRUNK & VAULT ONLY (NO HOME DROPS) PH1 JUNCT V6 V7 V8 V9 V10 TH-301 TH-308 TH-315 TH-322 TH-335 TH-342 TH-350 TH-360 TH-375 TH-388 TH-400 TH-412 END
Future Home (no drop)
Active Vault
Conduit Installed
Trunk Lit

Phase 2 Details

Trunk & vault build extending from Phase 1 junction. Prepared for future drops — no home connections in this phase.

Route Length~3,800 ft
Vaults5 (V6–V10)
Future Homes12 (drops later)
Fiber Type144-ct trunk
ConduitNot started
Trunk StatusNot lit
Active Vaults0 / 5
Drop ReadyNo

Vault Readiness

Each vault activates as the trunk is lit and tested through its position.

Note: Home drops (TH-301 through TH-412) are shown as gray placeholders only. These homes will receive drop connections in a future phase after Phase 2 trunk/vault build is complete.