Phase 1 delivers: Vault/enclosure assembly + trunk light-up + hot drop line to every Phase 1 home. Slider position saves automatically.
0%
Phase 1 Details
Complete build: headend through 5 vaults, hot drop to all Phase 1 homes.
Route Length~4,200 ft
Vaults5 (V1–V5)
Homes on Route12 hot drops
Fiber Type288-ct trunk
ConduitNot started
Trunk StatusNot lit
Drop StatusNo drops
Active Homes0 / 12
Home Hot Drop Status
Each home receives a hot drop line as Phase 1 progresses past 50%.